Client:
Department of Transport, Energy and Infrastructure
Location:
Happy Valley, South Australia
Features:
Multi purpose hall

Hames Sharley conducted a feasibility study for a type 2 hall that was completed in August 2005. The only available site was challenging as it featured poor bearing soils, water run off from the adjacent oval, an almost 2 metre rise and several significant trees.

As part of the feasibility study, user group representatives visited other key hall projects to consider materials, layout and climate control issues. Hames sharley was successful in delivering this project ahead of the programmed hand over.